FRANCE: REOPENING OF AN ABANDONED LINE
Classic line
- Location
- Oloron-Bedous Saint Marie - France
- Type
- Renewal of switches and crossings
Start/end date of construction site: 09/2014 to 06/2016
A closed line construction site corresponds to an interruption of operation for a significant period of time, to allow significant regeneration work to be carried out.
In the case of Oloron Bedous, the line was made available to us for closed-line execution.
This operation, corresponding to 25 kilometres of rail track, required the execution of execution studies and earthworks, sanitation, track, installation of detection nets, burial of networks, earthworks, installation of fences and access, development at level crossings, as well as the supply of all the materials, materials, equipment, products and components necessary to carry out the work specific to this site on the rail line.
It also included the mission related to the management of co-activity and rail safety on the entire line.