DOMINICAN REPUBLIC: EXTENSION OF METRO LINE 2B
Project
- Location
- Santo Domingo - Dominican Republic
- Type
- Track installation
Extension 2 B is an extension to Subway Line 2 previously constructed by TSO in association with CIM.
The connection to the existing Line 2 is located on a very special engineered structure, since the tracks have been laid on the central span of the world’s longest cable-stayed rail bridge.
Santo Domingo Subway Line 2 was officially opened and entered service in August 2018.