biseau_references_france
 
Fermer
 
 


B 20
 


Bétonnage de la voie.
Tunnel de Marseille
 


Pose d'appareil de voie
au bi-grue "CRAB"
 


Dégarnissage mécanique
de ballast
 


TGV EST - Portique GP 89
Dépose de voie auxilliaire et approvisionnement TBA neuves.

 


ZC-Redressage de rails
 


Renouvellement d'appareil de voie
 


Renouvellement de Plancher
   Liège-Cologne High speed line
> 2006-2007
Liège-German frontier section, track and catenaries laying.

 Mediterranean HIgh Speed Line
> 2005-2007:
Mechanical tamping works for switch gears


 Corsica > 2004-2007:
Central line and Balagne line.

 European High Speed Line
> 2004-2007:
380km of tack laying

 Marechaux South tramway
>2004-2006:
Railway works  of platform and sprinklers covering.


 Reneval of ballasted tracks
> 2002-2006:
National contract.
Continuous program on an annual basis of 190km.

 Grenoble Tramway > 2004-2005:
The town’s 3rd line.
Supply and laying of tracks and switch gears .

 Nantes Tramway > 2004:
Line 3, north extension .


 Western circular route
operation
> 2003-2004:
Noisy-le-Roi to St Germain-en-Laye
Track and switch gears laying and ballast implementation .


 High speed line Construction
> 2000-2002:
Brussels-Liège line .


 Renewal of ballasted tracks
> 1997-2001:
Continuous program
A 55 months contract
Annual basis of 210 km.

 Mediterranean High Speed Line
> 1999-2000:
Track laying in the tunnel of Marseille
Switch gears laying and ballast implementation.


 Orleans Tramway > 1998-2000:
Track laying for sections 1 and 2
Reconditioning of the workshop.

 Regenerationof the South East High Speed Line > 1996-2000:
Paris-Lyon Line
350 km rail and 65 switch gears .


 Eole-lot 51 A > 1997-1998:
Concrete track laying between Paris-East and St Lazare.


 Parisian Express Rail Network Line A > 1994-1995:
Rails renovation and electrical welding (Flash butt welding).

 Parisian Express Rail Network Line D > 1994-1995:
Laying of a new concrete track in the Parisian Express Rail Network tunnels between Chatelet and Gare de Lyon stations.

 Rhône Alpes High Speed Line
> 1994-1997:

234km of track laying (120 km of double track) and 49 switch gears for a running speed of 330 km/h between Lyon and Valence.


 Val de Seine Tramway (T.V.S)
> 1994-1997:

11 km of track renovation and modernization of 10 km for tramway traffic.

 Northern High Speed Line
> 1991-1993:
300 km of new track laying (150 km of double track) and 65 switch gears for a running speed of 330 km/h.

 Shuttle Tunnel > 1990-1993:

 Parisian Express Rail Network Line A - Extension > 1990-1991:
Construction of the regional metro line
Torcy to Chessy extension (Eurodisney Parc station) and restructuring of Torcy station .

 Atlantic High Speed Line
> 1987-1989:

Lot N°2, laying of 312 km of track
World record zone 515,3 km realized on the 18 th of May 1990.
A new High Speed Line to operate at 330 km/h.
 


Renouvellement de voie
 


Pose de voie nouvelle
Phase de bourrage sur viaduc
 


Remplacement d'appareils provisoires sur ligne à grande vitesse
 


Remplacement d'éléments d'appareils de voie sur ligne à grande vitesse
 


Installation d'une communication croisée dans le tunnel sous la Manche
 


TVS - Évacuation
du vieux ballast après criblage
 


VAD